{"id":22115,"date":"2026-09-21T17:06:38","date_gmt":"2026-09-21T17:06:38","guid":{"rendered":"https:\/\/www.mosquebuild.com\/?page_id=22115"},"modified":"2026-10-01T00:08:31","modified_gmt":"2026-10-01T00:08:31","slug":"mosque-buildability-design-review","status":"publish","type":"page","link":"https:\/\/www.mosquebuild.com\/arb\/mosque-buildability-design-review\/","title":{"rendered":"\u0645\u0631\u0627\u062c\u0639\u0629 \u0642\u0627\u0628\u0644\u064a\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0648\u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0644\u0644\u0645\u0633\u0627\u062c\u062f"},"content":{"rendered":"<nav class=\"mbgs-standard-nav\" aria-label=\"MosqueBuild guide library\"><div class=\"mbgs-standard-nav__inner\"><strong>\u0623\u062f\u0644\u0629 MosqueBuild<\/strong><div class=\"mbgs-standard-nav__links\"><a href=\"https:\/\/www.mosquebuild.com\/arb\/mosque-design-buying-guides\/\">\u0645\u0643\u062a\u0628\u0629 \u0627\u0644\u0623\u062f\u0644\u0629<\/a><a href=\"https:\/\/www.mosquebuild.com\/arb\/chandelier\/\">\u0645\u0634\u0631\u0648\u0639 \u062a\u0635\u0645\u064a\u0645 \u0645\u0633\u062c\u062f \u0645\u062e\u0635\u0635 \u0644\u0645\u0634\u0631\u0648\u0639\u0627\u062a \u0627\u0644\u0645\u0633\u0627\u062c\u062f<\/a><a href=\"https:\/\/www.mosquebuild.com\/arb\/minbar-mihrab-guides\/\">Mihrab &amp; Furniture<\/a><a href=\"https:\/\/www.mosquebuild.com\/arb\/mosque-doors-windows-woodwork-guides\/\">\u0627\u0644\u0623\u0628\u0648\u0627\u0628 &amp; \u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u062e\u0634\u0628\u064a\u0629<\/a><a href=\"https:\/\/www.mosquebuild.com\/arb\/mosque-carpet-interior-equipment-guides\/\">Interior &amp; Carpet<\/a><a href=\"https:\/\/www.mosquebuild.com\/arb\/mosque-dome-minaret-construction-guides\/\">Dome &amp; Construction<\/a><a href=\"https:\/\/www.mosquebuild.com\/arb\/mosque-construction-library\/\">\u0645\u0643\u062a\u0628\u0629 \u0627\u0644\u0628\u0646\u0627\u0621<\/a><a href=\"https:\/\/www.mosquebuild.com\/arb\/mosque-interior-furniture-library\/\">\u0627\u0644\u0639\u0645\u0627\u0631\u0629 \u0627\u0644\u062f\u0627\u062e\u0644\u064a\u0629<\/a><\/div><\/div><\/nav>\n\n<article class=\"mbcl-commercial-guide mbcl-longform\">\n<p class=\"mb-library-kicker\">Mosque Construction Library \u00b7 Architecture &#038; Coordination<\/p>\n<h1>\u0645\u0631\u0627\u062c\u0639\u0629 \u0642\u0627\u0628\u0644\u064a\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0648\u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0644\u0644\u0645\u0633\u0627\u062c\u062f<\/h1>\n<p class=\"mbcl-lead\">A mosque buildability and design review tests whether the architectural concept can be constructed, manufactured, transported, installed and maintained without compromising the intended worship environment. It is most valuable before construction drawings and specialist procurement are released.<\/p>\n<div class=\"mbcl-summary\"><strong>Use this guide to:<\/strong> define scope, coordinate responsibilities, reduce interface risk, prepare procurement information and improve project delivery before irreversible design, manufacturing or site decisions are made.<\/div>\n<h2>Why this topic matters in mosque construction<\/h2>\n<p>Mosque projects bring together ordinary building disciplines and specialist religious architecture. Decisions made in one package can affect several others: structure can change dome or minaret geometry; MEP routes can conflict with ceilings and decorative work; procurement can influence module sizes; and site access can determine how large specialist elements are manufactured. The project team should therefore treat this subject as part of an integrated information workflow rather than a stand-alone task.<\/p>\n<h2>What a buildability review should cover<\/h2><p>Review structural grids, wall thicknesses, ceiling zones, dome supports, minaret interfaces, roof drainage, fa\u00e7ade joints, MEP routes, chandelier suspension, qibla-wall build-up, door openings, carpet setting-out and access panels. The objective is to identify clashes and missing information while changes are still inexpensive.<\/p><h2>Geometry and tolerance<\/h2><p>Complex geometry can amplify small errors. Repeated timber panels, curved dome segments, stone joints and minaret modules need agreed survey datums and realistic installation tolerances. Shop drawings should show where adjustment is allowed and where exact fit is required.<\/p><h2>Specialist manufacturer input<\/h2><p>Specialists can identify fabrication limits that are not obvious in architectural drawings. Dome, minaret, chandelier, joinery, stained-glass and fa\u00e7ade suppliers should review key interfaces before final details are frozen. Their input should be coordinated by the design team rather than adopted independently.<\/p><h2>\u0627\u0644\u0648\u0635\u0648\u0644 \u0644\u0644\u0635\u064a\u0627\u0646\u0629<\/h2><p>Buildability includes future operation. Filters, drivers, speakers, gutters, roof outlets, waterproofing terminations, access panels and lighting components must be reachable after completion. A detail that looks clean but cannot be maintained will create avoidable operating cost.<\/p><h2>Review comments and closeout<\/h2><p>Comments should be logged with drawing reference, discipline, owner, status and required action. Closed comments should be reflected in the current drawing set. Verbal decisions without a recorded revision create uncertainty during procurement and site work.<\/p><h2>When to repeat the review<\/h2><p>Repeat buildability review after major structural changes, value engineering, specialist supplier appointment or significant authority comments. The project may be buildable at concept stage but become conflicted after later substitutions.<\/p>\n<h2>\u0633\u064a\u0631 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0642\u062a\u0631\u062d \u0644\u0644\u0645\u0634\u0631\u0648\u0639<\/h2>\n<ol>\n<li><strong>Confirm the latest inputs.<\/strong> Verify drawings, site information, dimensions, project location, capacity and authority requirements.<\/li>\n<li><strong>\u062d\u062f\u0651\u062f \u0627\u0644\u0645\u0633\u0624\u0648\u0644\u064a\u0627\u062a.<\/strong> Identify the owner, architect, engineer, contractor, specialist supplier and approver for each deliverable.<\/li>\n<li><strong>\u062a\u0646\u0633\u064a\u0642 \u0646\u0642\u0627\u0637 \u0627\u0644\u062a\u062f\u0627\u062e\u0644.<\/strong> Review structure, MEP, waterproofing, finishes, access, logistics and adjacent packages.<\/li>\n<li><strong>Issue controlled information.<\/strong> Use revision-controlled drawings, submittals, samples and written approvals.<\/li>\n<li><strong>Release procurement or fabrication.<\/strong> Do not release custom work before critical geometry and finishes are approved.<\/li>\n<li><strong>Inspect and document.<\/strong> Record key inspections, changes, tests and as-built information through handover.<\/li>\n<\/ol>\n<h2>Minimum information checklist<\/h2>\n<table class=\"mbcl-table\"><thead><tr><th>\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/th><th>Why it matters<\/th><\/tr><\/thead><tbody>\n<tr><td>Project location and current stage<\/td><td>Determines authority context, logistics, climate assumptions and required level of detail.<\/td><\/tr>\n<tr><td>Latest architectural and structural drawings<\/td><td>Provides coordinated geometry, levels, openings and support conditions.<\/td><\/tr>\n<tr><td>Verified site dimensions where relevant<\/td><td>Reduces fabrication and installation errors caused by outdated drawings.<\/td><\/tr>\n<tr><td>\u0645\u0635\u0641\u0648\u0641\u0629 \u0646\u0637\u0627\u0642 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0645\u0633\u0624\u0648\u0644\u064a\u0627\u062a<\/td><td>Prevents gaps between design, supply, transport, installation and testing.<\/td><\/tr>\n<tr><td>Material and finish approvals<\/td><td>Creates a controlled benchmark for procurement and quality inspection.<\/td><\/tr>\n<tr><td>Programme and required-on-site dates<\/td><td>Connects approvals and long-lead manufacturing to the construction sequence.<\/td><\/tr>\n<\/tbody><\/table>\n<h2>Common coordination risks<\/h2>\n<ul>\n<li>Starting detailed work before geometry or site conditions are verified.<\/li>\n<li>Assuming another party owns an interface without documenting responsibility.<\/li>\n<li>Approving appearance without checking structure, access, waterproofing or maintenance.<\/li>\n<li>Releasing fabrication before shop drawings and material samples are fully coordinated.<\/li>\n<li>Ignoring transport, lifting, customs or site storage until production is complete.<\/li>\n<li>Failing to update as-built records after site changes.<\/li>\n<\/ul>\n<h2>RFQ and procurement questions<\/h2>\n<p>When requesting a quotation, issue enough information for suppliers to price the same scope. State the project location, dimensions, quantities, material and finish intent, drawing and engineering responsibilities, packaging and transport expectations, installation scope, programme, testing requirements, exclusions and required warranty information. For international projects, identify who controls customs clearance, unloading, local transport and site installation.<\/p>\n<h2>\u0627\u0644\u062c\u0648\u062f\u0629 \u0648\u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0627\u0644\u0646\u0647\u0627\u0626\u064a<\/h2>\n<p>Project quality is easier to manage when approval and inspection points are planned before work begins. Preserve approved samples, shop drawings, inspection records, test reports, warranties and maintenance information. At handover, the owner should receive a clear record of what was installed, how it should be maintained and which components require future access or specialist replacement.<\/p>\n<h2>\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n<h3>When should this subject be addressed?<\/h3>\n<p>Early enough that dependent design, procurement and construction packages can still be changed without rework. For specialist mosque components this is usually before structural supports, service routes or finishes are frozen.<\/p>\n<h3>Who should approve the final technical solution?<\/h3>\n<p>The project\u2019s appointed designers, licensed engineers and relevant authorities remain responsible for regulated design and statutory approval within their jurisdiction. Specialist manufacturers can provide product, fabrication and interface information within their agreed scope.<\/p>\n<h3>\u0647\u0644 \u064a\u0645\u0643\u0646 \u0625\u0639\u0627\u062f\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u062a\u0641\u0635\u064a\u0644 \u0646\u0641\u0633\u0647 \u0641\u064a \u0643\u0644 \u0645\u0633\u062c\u062f\u061f<\/h3>\n<p>No. Capacity, geometry, climate, codes, structure, local construction methods, transport limits and architectural language vary. Reusable standards are useful, but final design decisions should be project-specific.<\/p>\n<h3>What should be checked before installation?<\/h3>\n<p>Check the current approved drawings, site dimensions, substrate or support readiness, access and lifting needs, material condition, fixing locations, adjacent completed work and the required inspection sequence.<\/p>\n<section class=\"mbcl-context-links\"><h2>Continue through the project workflow<\/h2><p>This topic connects directly with <a href=\"\/arb\/mosque-bim-coordination-services\/\">\u0627\u0644\u062a\u0646\u0633\u064a\u0642 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0645\u0630\u062c\u0629 \u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621<\/a>, <a href=\"\/arb\/mosque-rfi-technical-submittal-workflow\/\">RFI and submittal workflow<\/a>, <a href=\"\/arb\/mosque-mockup-sample-approval\/\">mock-up and sample approval<\/a> and <a href=\"\/arb\/mosque-construction-supervision\/\">\u0627\u0644\u0625\u0634\u0631\u0627\u0641 \u0639\u0644\u0649 \u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0628\u0646\u0627\u0621<\/a>. Use these related guides to move from one project decision to the next without treating design, engineering, procurement and construction as isolated tasks.<\/p><\/section><h2>\u0645\u0648\u0627\u0631\u062f MosqueBuild \u0630\u0627\u062a \u0627\u0644\u0635\u0644\u0629<\/h2>\n<ul class=\"mbcl-related-links\"><li><a href=\"\/arb\/mosque-architectural-design-planning\/\">Architectural Design &#038; Planning<\/a><\/li><li><a href=\"\/arb\/mosque-shop-drawings\/\">\u0645\u062e\u0637\u0637\u0627\u062a \u0627\u0644\u0648\u0631\u0634\u0629 \u0644\u0644\u0645\u0633\u062c\u062f<\/a><\/li><li><a href=\"\/arb\/mosque-bim-revit-model\/\">Mosque BIM &#038; Revit<\/a><\/li><li><a href=\"\/arb\/mosque-construction-scope-matrix\/\">\u0645\u0635\u0641\u0648\u0641\u0629 \u0646\u0637\u0627\u0642 \u0627\u0644\u0639\u0645\u0644<\/a><\/li><li><a href=\"\/arb\/mosque-construction-library\/\">\u0645\u0643\u062a\u0628\u0629 \u0625\u0646\u0634\u0627\u0621 \u0627\u0644\u0645\u0633\u0627\u062c\u062f<\/a><\/li><\/ul>\n<div class=\"mbcl-note\"><strong>\u0645\u0644\u0627\u062d\u0638\u0629 \u062a\u0635\u0645\u064a\u0645 \u062e\u0627\u0635\u0629 \u0628\u0627\u0644\u0645\u0634\u0631\u0648\u0639:<\/strong> Structural, fire, accessibility, electrical, mechanical, waterproofing and other statutory requirements must be verified by the project\u2019s responsible licensed professionals and local authorities.<\/div>\n<section class=\"mb-guide-commerce-block\" style=\"margin:32px 0 26px\"><h2>Project Applications &#038; References<\/h2><div style=\"margin-top:16px;padding:15px 17px;border:1px solid #e5dfd5;border-radius:14px;background:#faf8f4\"><strong>\u062a\u0637\u0628\u064a\u0642\u0627\u062a\u0646\u0627<\/strong><div style=\"margin-top:6px\"><a href=\"\/arb\/%d8%a7%d9%84%d9%85%d8%b1%d8%a7%d8%ac%d8%b9\/\">\u0639\u0631\u0636 \u062c\u0645\u064a\u0639 \u0645\u0631\u0627\u062c\u0639 MosqueBuild \u2190<\/a><\/div><\/div><\/section><\/article>","protected":false},"excerpt":{"rendered":"<p>A mosque buildability and design review tests whether the architectural concept can be constructed, manufactured, transported, installed and maintained without compromising the intended worship environment. It is most valuable before construction drawings and specialist procurement are released.<\/p>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_mbkl_enabled":false,"_mbkl_owner_topic":"","_mbkl_min_words":750,"_mbkl_content_status":"planned","_mbkl_cluster_key":"","_mbkl_node_order":0,"_mbkl_source_notes":[],"_mbml_enabled":false,"_mbml_owner_topic":"","_mbml_min_words":750,"_mbml_content_status":"planned","_mbml_cluster_key":"","_mbml_node_order":0,"_mbml_source_notes":[]},"mb_minaret_knowledge_section":[],"mb_minaret_section":[],"class_list":["post-22115","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mosque Buildability &amp; Design Review | Technical Coordination<\/title>\n<meta name=\"description\" content=\"Buildability and design review for mosque projects, coordinating architecture, structure, MEP, interiors, domes, minarets and construction interfaces.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mosquebuild.com\/arb\/mosque-buildability-design-review\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mosque Buildability &amp; Design Review\" \/>\n<meta property=\"og:description\" content=\"Buildability and design review for mosque projects, coordinating architecture, structure, MEP, interiors, domes, minarets and construction interfaces.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mosquebuild.com\/arb\/mosque-buildability-design-review\/\" \/>\n<meta property=\"og:site_name\" content=\"MosqueBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-01T00:08:31+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-buildability-design-review\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-buildability-design-review\\\/\",\"name\":\"Mosque Buildability & Design Review | Technical Coordination\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\"},\"datePublished\":\"2026-09-21T17:06:38+00:00\",\"dateModified\":\"2026-10-01T00:08:31+00:00\",\"description\":\"Buildability and design review for mosque projects, coordinating architecture, structure, MEP, interiors, domes, minarets and construction interfaces.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-buildability-design-review\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-buildability-design-review\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-buildability-design-review\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mosquebuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mosque Buildability &#038; Design Review\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"name\":\"MosqueBuild\",\"description\":\"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\"},\"alternateName\":\"Mosque Build\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mosquebuild.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\",\"name\":\"MosqueBuild\",\"alternateName\":\"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"contentUrl\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"width\":919,\"height\":218,\"caption\":\"MosqueBuild\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"description\":\"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.\",\"legalName\":\"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mosque Buildability & Design Review | Technical Coordination","description":"Buildability and design review for mosque projects, coordinating architecture, structure, MEP, interiors, domes, minarets and construction interfaces.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mosquebuild.com\/arb\/mosque-buildability-design-review\/","og_locale":"ar_AR","og_type":"article","og_title":"Mosque Buildability & Design Review","og_description":"Buildability and design review for mosque projects, coordinating architecture, structure, MEP, interiors, domes, minarets and construction interfaces.","og_url":"https:\/\/www.mosquebuild.com\/arb\/mosque-buildability-design-review\/","og_site_name":"MosqueBuild","article_modified_time":"2026-10-01T00:08:31+00:00","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"5 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mosquebuild.com\/mosque-buildability-design-review\/","url":"https:\/\/www.mosquebuild.com\/mosque-buildability-design-review\/","name":"Mosque Buildability & Design Review | Technical Coordination","isPartOf":{"@id":"https:\/\/www.mosquebuild.com\/#website"},"datePublished":"2026-09-21T17:06:38+00:00","dateModified":"2026-10-01T00:08:31+00:00","description":"Buildability and design review for mosque projects, coordinating architecture, structure, MEP, interiors, domes, minarets and construction interfaces.","breadcrumb":{"@id":"https:\/\/www.mosquebuild.com\/mosque-buildability-design-review\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mosquebuild.com\/mosque-buildability-design-review\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.mosquebuild.com\/mosque-buildability-design-review\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mosquebuild.com\/"},{"@type":"ListItem","position":2,"name":"Mosque Buildability &#038; Design Review"}]},{"@type":"WebSite","@id":"https:\/\/www.mosquebuild.com\/#website","url":"https:\/\/www.mosquebuild.com\/","name":"MosqueBuild","description":"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture","publisher":{"@id":"https:\/\/www.mosquebuild.com\/#organization"},"alternateName":"Mosque Build","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mosquebuild.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/www.mosquebuild.com\/#organization","name":"MosqueBuild","alternateName":"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri","url":"https:\/\/www.mosquebuild.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","contentUrl":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","width":919,"height":218,"caption":"MosqueBuild"},"image":{"@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/"},"description":"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.","legalName":"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130."}]}},"_links":{"self":[{"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/pages\/22115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/comments?post=22115"}],"version-history":[{"count":3,"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/pages\/22115\/revisions"}],"predecessor-version":[{"id":24169,"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/pages\/22115\/revisions\/24169"}],"wp:attachment":[{"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/media?parent=22115"}],"wp:term":[{"taxonomy":"mb_minaret_knowledge_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/mb_minaret_knowledge_section?post=22115"},{"taxonomy":"mb_minaret_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/arb\/wp-json\/wp\/v2\/mb_minaret_section?post=22115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}