{"id":20696,"date":"2026-09-14T18:07:09","date_gmt":"2026-09-14T18:07:09","guid":{"rendered":"https:\/\/www.mosquebuild.com\/?page_id=20696"},"modified":"2026-11-09T21:06:30","modified_gmt":"2026-11-09T21:06:30","slug":"mosque-dome-measurement-survey","status":"publish","type":"page","link":"https:\/\/www.mosquebuild.com\/fr\/mosque-dome-measurement-survey\/","title":{"rendered":"Comment relever un d\u00f4me de mosqu\u00e9e pour rev\u00eatement ou remplacement"},"content":{"rendered":"<p><strong>Comment relever un d\u00f4me de mosqu\u00e9e pour rev\u00eatement ou remplacement<\/strong> est un guide de planification de projet destin\u00e9 aux \u00e9quipes qui \u00e9tudient relev\u00e9 dimensionnel du d\u00f4me de mosqu\u00e9e. La page aborde g\u00e9om\u00e9trie du d\u00f4me, structure, rev\u00eatement, \u00e9tanch\u00e9it\u00e9, isolation et interfaces de pose. L'objectif est d'aider le comit\u00e9 de mosqu\u00e9e, l'architecte, l'entreprise ou l'acheteur \u00e0 d\u00e9finir les informations n\u00e9cessaires avant de demander une fabrication ou un accompagnement du projet.<\/p>\n<h2>Probl\u00e9matique et p\u00e9rim\u00e8tre du projet<\/h2>\n<p>La premi\u00e8re \u00e9tape consiste \u00e0 d\u00e9finir les besoins r\u00e9els du projet, les \u00e9l\u00e9ments d\u00e9j\u00e0 arr\u00eat\u00e9s et les choix encore ouverts en mati\u00e8re de conception ou d'achat. Pour relev\u00e9 dimensionnel du d\u00f4me de mosqu\u00e9e, les d\u00e9cisions doivent reposer sur des relev\u00e9s r\u00e9els du site, l'usage pr\u00e9vu et les interfaces avec les syst\u00e8mes voisins de la mosqu\u00e9e. Si des autorisations locales ou des \u00e9tudes techniques sp\u00e9cialis\u00e9es sont n\u00e9cessaires, leurs responsables doivent \u00eatre d\u00e9sign\u00e9s avant la production.<\/p>\n<h2>D\u00e9cisions cl\u00e9s de conception et d\u2019achat<\/h2>\n<ul>\n<li>diam\u00e8tre, fl\u00e8che et profil<\/li>\n<li>structure porteuse<\/li>\n<li>orientation du bardage \/ mat\u00e9riau<\/li>\n<li>strat\u00e9gie d\u2019\u00e9tanch\u00e9it\u00e9 et thermique<\/li>\n<li>comment mesurer un d\u00f4me de mosqu\u00e9e influence le brief final du projet<\/li>\n<li>comment le relev\u00e9 du d\u00f4me influence le brief final du projet<\/li>\n<li>comment le rayon du d\u00f4me influence le brief final du projet<\/li>\n<\/ul>\n<h2>Mat\u00e9riaux, syst\u00e8mes et coordination<\/h2>\n<p>the dome shell, secondary frame, joints, flashings and finishes need coordinated detailing rather than isolated product selection. Material, finish and fabrication choices should be recorded in the approved project brief so that drawings, production, packing and installation are working from the same assumptions.<\/p>\n<p><strong>Informations \u00e0 confirmer pour le projet :<\/strong> Real MosqueBuild workshop\/site detail, material sample, measurement\/installation sequence or verified completed reference.<\/p>\n<h2>Erreurs courantes \u00e0 \u00e9viter<\/h2>\n<ul>\n<li>choisir le bardage avant de fixer la g\u00e9om\u00e9trie du support<\/li>\n<li>sous-estimer les joints et les cheminements de l\u2019eau<\/li>\n<li>ignorer la segmentation pour le transport et le levage<\/li>\n<\/ul>\n<p><strong>Note concernant le projet :<\/strong> Final specifications should be confirmed against project-specific drawings, site conditions and local requirements before quotation or fabrication.<\/p>\n<h2>\u00c9l\u00e9ments \u00e0 envoyer pour un devis ou une \u00e9tude technique<\/h2>\n<ul>\n<li>diam\u00e8tre et hauteur du d\u00f4me<\/li>\n<li>plans de support<\/li>\n<li>emplacement du projet<\/li>\n<li>finition \/ mat\u00e9riau pr\u00e9f\u00e9r\u00e9<\/li>\n<li>informations sur le levage et l\u2019acc\u00e8s au site<\/li>\n<\/ul>\n<p><strong>Demande de projet :<\/strong> Envoyez les plans, dimensions, photos et la destination pour un devis sp\u00e9cifique au projet.<\/p>\n<h2>\u00c9tape suivante<\/h2>\n<p>After the project brief is confirmed, the page can be connected to the correct MosqueBuild main technical hub, one closely related technical guide and the RFQ\/contact path. Those internal links should connect this guide to the relevant technical hub, a closely related technical guide and the project enquiry path.<\/p>\n<h2>Liste de contr\u00f4le des sp\u00e9cifications du projet<\/h2>\n<p>Confirm verified dimensions, project location, intended use, material and finish requirements, installation interfaces, delivery scope and the responsible professional approvals before quotation or fabrication.<\/p>\n<ul>\n<li>plans cot\u00e9s ou dimensions du site<\/li>\n<li>emplacement du projet et usage pr\u00e9vu<\/li>\n<li>exigences de mat\u00e9riau, finition et quantit\u00e9<\/li>\n<li>responsabilit\u00e9s de livraison, installation et approbation<\/li>\n<\/ul>\n<h2>Notes de coordination de projet MosqueBuild<\/h2>\n<p>Final structural, electrical, MEP, fire, accessibility, wind, seismic, waterproofing and other regulated requirements are project-specific and must be checked by the responsible local professionals where applicable.<\/p>\n<h2>Ressources MosqueBuild associ\u00e9es<\/h2>\n<ul>\n<li><a href=\"\/fr\/construction-de-mosquees\/\">Coordination de la construction de mosqu\u00e9e<\/a><\/li>\n<li><a href=\"\/fr\/contact\/\">Demander une \u00e9tude du projet<\/a><\/li>\n<\/ul>\n<style id=\"mbcl-v2-css\">.mbcl-v2{max-width:1180px;margin:0 auto;padding:clamp(22px,4vw,54px);background:#fff;border:1px solid #ebe7df;border-radius:22px;box-shadow:0 12px 36px rgba(30,24,17,.04)}.mbcl-v2 .mb-library-kicker{font-size:12px;letter-spacing:.14em;text-transform:uppercase;font-weight:700;color:#756b5d}.mbcl-v2 .mbcl-lead{font-size:1.12em;line-height:1.8}.mbcl-v2 h2{margin-top:2.1em}.mbcl-v2 h3{margin-top:1.55em}.mbcl-v2 p,.mbcl-v2 li{line-height:1.78}.mbcl-breadcrumb{font-size:14px;margin-bottom:20px}.mbcl-breadcrumb span{padding:0 8px}.mbcl-grid{display:grid;grid-template-columns:repeat(3,minmax(0,1fr));gap:14px;margin:20px 0 30px}.mbcl-card{display:flex;flex-direction:column;gap:7px;padding:18px;border:1px solid #e6e0d7;border-radius:14px;background:#faf8f4;text-decoration:none}.mbcl-card span{font-size:13px;color:#746d64}.mbcl-related ul{display:grid;grid-template-columns:repeat(2,minmax(0,1fr));gap:10px;padding:0;list-style:none}.mbcl-related a{display:block;padding:12px 14px;border:1px solid #e6e0d7;border-radius:10px}.mbcl-note{margin-top:28px;padding:18px;border-left:4px solid #9b8c76;background:#faf8f4}.mbcl-table-wrap{overflow-x:auto}.mbcl-table-wrap table{width:100%;border-collapse:collapse}.mbcl-table-wrap th,.mbcl-table-wrap td{padding:12px;border:1px solid #e9e4dc;text-align:left;vertical-align:top}@media(max-width:900px){.mbcl-grid{grid-template-columns:repeat(2,minmax(0,1fr))}}@media(max-width:600px){.mbcl-v2{padding:20px 16px;border-radius:14px}.mbcl-grid,.mbcl-related ul{grid-template-columns:1fr}.mbcl-card{min-height:48px}}<\/style>\n<section class=\"mbcl-existing-expansion mbcl-v2\" id=\"mosque-construction-library-context\">\n<h2>relev\u00e9 de l'\u00e9tat existant d'une mosqu\u00e9e \u2014 guide de coordination du projet<\/h2>\n<p>relev\u00e9 de l'\u00e9tat existant d'une mosqu\u00e9e doit \u00eatre envisag\u00e9 comme une partie du projet global de mosqu\u00e9e, et non comme une d\u00e9cision de conception ou d'achat isol\u00e9e. L'architecture, l'ing\u00e9nierie, la fabrication sp\u00e9cialis\u00e9e, les installations du b\u00e2timent, la logistique du chantier et la maintenance \u00e0 long terme peuvent influencer la solution finale. Un cahier des charges solide pr\u00e9cise donc avant les \u00e9tudes d\u00e9taill\u00e9es les performances attendues, les donn\u00e9es disponibles, le d\u00e9cideur, les livrables et les interfaces avec les autres lots.<\/p>\n<h3>Informations \u00e0 confirmer avant la conception d\u00e9taill\u00e9e<\/h3>\n<p>Avant de d\u00e9velopper relev\u00e9 de l'\u00e9tat existant d'une mosqu\u00e9e, l'\u00e9quipe de projet doit v\u00e9rifier les derni\u00e8res donn\u00e9es du site, les dimensions, les plans architecturaux, les hypoth\u00e8ses structurelles, les besoins d'occupation ou de capacit\u00e9, les contraintes des autorit\u00e9s locales et les pr\u00e9f\u00e9rences pertinentes de mat\u00e9riaux ou de finitions. Les b\u00e2timents existants doivent faire l'objet d'un relev\u00e9 sur place plut\u00f4t que de se fier uniquement aux anciens plans. Lorsqu'un \u00e9l\u00e9ment sp\u00e9cialis\u00e9 se raccorde au b\u00e9ton, \u00e0 l'acier, \u00e0 la ma\u00e7onnerie, \u00e0 l'\u00e9tanch\u00e9it\u00e9 ou aux installations techniques, les conditions d'appui et les tol\u00e9rances doivent \u00eatre confirm\u00e9es en amont.<\/p>\n<h3>Coordination, qualit\u00e9 et ma\u00eetrise des risques<\/h3>\n<p>Le domaine relev\u00e9 de l'\u00e9tat existant d'une mosqu\u00e9e peut concerner plusieurs disciplines \u00e0 la fois. L'architecture d\u00e9finit la g\u00e9om\u00e9trie et l'intention visuelle ; l'ing\u00e9nierie structurelle v\u00e9rifie les chemins de charge et les appuis ; les \u00e9quipes techniques pr\u00e9servent les cheminements, travers\u00e9es et acc\u00e8s ; les fabricants sp\u00e9cialis\u00e9s transforment les plans approuv\u00e9s en d\u00e9tails de fabrication ; et l'entreprise coordonne les tol\u00e9rances, les s\u00e9quences et les conditions du chantier. Un registre des interfaces permet de suivre les d\u00e9cisions transversales.<\/p>\n<p>Les risques courants li\u00e9s \u00e0 relev\u00e9 de l'\u00e9tat existant d'une mosqu\u00e9e comprennent le lancement d'\u00e9tudes d\u00e9taill\u00e9es avec des dimensions incompl\u00e8tes, le renvoi des responsabilit\u00e9s \u00e0 un autre corps de m\u00e9tier, l'approbation de l'aspect sans v\u00e9rifier la constructibilit\u00e9 et la modification de la g\u00e9om\u00e9trie apr\u00e8s diffusion des lots d\u00e9pendants. Le transport, le levage, l'acc\u00e8s pour la maintenance ou le remplacement sont aussi souvent consid\u00e9r\u00e9s trop tard. Ces risques se ma\u00eetrisent mieux lorsque l'\u00e9quipe attribue les responsabilit\u00e9s et fige progressivement les interfaces.<\/p>\n<h3>Approvisionnement et remise du projet<\/h3>\n<p>Les comparaisons commerciales concernant relev\u00e9 de l'\u00e9tat existant d'une mosqu\u00e9e doivent reposer sur un p\u00e9rim\u00e8tre clairement d\u00e9fini, et non sur un simple prix unitaire annonc\u00e9. Les demandes de devis doivent pr\u00e9ciser dimensions, quantit\u00e9s, mat\u00e9riaux, finitions, responsabilit\u00e9s d'ing\u00e9nierie, plans, essais, emballage, exp\u00e9dition, installation et exclusions. Pour comparer des variantes, il faut consid\u00e9rer aussi le calendrier, la maintenance, la logistique et les effets sur le cycle de vie, en plus du co\u00fbt initial.<\/p>\n<p>Le dossier de remise pour relev\u00e9 de l'\u00e9tat existant d'une mosqu\u00e9e doit conserver les informations n\u00e9cessaires \u00e0 l'exploitation, aux inspections, \u00e0 la maintenance et aux modifications futures. Il faut enregistrer les mat\u00e9riaux approuv\u00e9s, les donn\u00e9es produits, les garanties, les fr\u00e9quences de nettoyage ou de contr\u00f4le, les acc\u00e8s, les pi\u00e8ces de rechange et les modifications r\u00e9ellement ex\u00e9cut\u00e9es. Pour les \u00e9l\u00e9ments techniques, les plans d\u00e9finitifs approuv\u00e9s et les r\u00e9f\u00e9rences de calcul ou de certification doivent rester archiv\u00e9s.<\/p>\n<nav class=\"mbcl-related\" aria-label=\"Related mosque construction guides\">\n<h2>Related mosque construction guides<\/h2>\n<ul>\n<li><a href=\"\/fr\/mosque-renovation-furniture\/\">Conception et ing\u00e9nierie de r\u00e9novation de mosqu\u00e9e<\/a><\/li>\n<li><a href=\"\/fr\/historic-mosque-conservation-planning\/\">Planification de conservation des mosqu\u00e9es historiques<\/a><\/li>\n<li><a href=\"\/fr\/mosque-structural-strengthening\/\">Renforcement structurel des mosqu\u00e9es<\/a><\/li>\n<li><a href=\"\/fr\/mosque-dome-leak-repair\/\">R\u00e9paration des fuites de d\u00f4me de mosqu\u00e9e<\/a><\/li>\n<li><a href=\"\/fr\/minaret-crack-repair\/\">R\u00e9paration des fissures de minarets<\/a><\/li>\n<li><a href=\"\/fr\/mosque-facade-cleaning\/\">Nettoyage et r\u00e9paration des fa\u00e7ades de mosqu\u00e9e<\/a><\/li>\n<li><a href=\"\/fr\/mosque-dome-restoration\/\">Mosque Dome &amp; Minaret Restoration<\/a><\/li>\n<li><a href=\"\/fr\/minaret-restoration\/\">restauration du minaret<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>How to Survey a Mosque Dome for Cladding or Replacement is a project-planning guide for teams researching mosque dome measurement<\/p>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_mbkl_enabled":false,"_mbkl_owner_topic":"","_mbkl_min_words":750,"_mbkl_content_status":"planned","_mbkl_cluster_key":"","_mbkl_node_order":0,"_mbkl_source_notes":[],"_mbml_enabled":false,"_mbml_owner_topic":"","_mbml_min_words":750,"_mbml_content_status":"planned","_mbml_cluster_key":"","_mbml_node_order":0,"_mbml_source_notes":[]},"mb_minaret_knowledge_section":[],"mb_minaret_section":[],"class_list":["post-20696","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How to Survey a Mosque Dome for Cladding or Replacement<\/title>\n<meta name=\"description\" content=\"Prepare a mosque dome survey for cladding or replacement using geometry, opening positions, support conditions and measurement checks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mosquebuild.com\/fr\/mosque-dome-measurement-survey\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Survey a Mosque Dome for Cladding or Replacement\" \/>\n<meta property=\"og:description\" content=\"Prepare a mosque dome survey for cladding or replacement using geometry, opening positions, support conditions and measurement checks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mosquebuild.com\/fr\/mosque-dome-measurement-survey\/\" \/>\n<meta property=\"og:site_name\" content=\"MosqueBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-09T21:06:30+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-dome-measurement-survey\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-dome-measurement-survey\\\/\",\"name\":\"How to Survey a Mosque Dome for Cladding or Replacement\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\"},\"datePublished\":\"2026-09-14T18:07:09+00:00\",\"dateModified\":\"2026-11-09T21:06:30+00:00\",\"description\":\"Prepare a mosque dome survey for cladding or replacement using geometry, opening positions, support conditions and measurement checks.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-dome-measurement-survey\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-dome-measurement-survey\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-dome-measurement-survey\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mosquebuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Survey a Mosque Dome for Cladding or Replacement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"name\":\"MosqueBuild\",\"description\":\"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\"},\"alternateName\":\"Mosque Build\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mosquebuild.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\",\"name\":\"MosqueBuild\",\"alternateName\":\"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"contentUrl\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"width\":919,\"height\":218,\"caption\":\"MosqueBuild\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"description\":\"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.\",\"legalName\":\"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comment relever un d\u00f4me de mosqu\u00e9e pour rev\u00eatement ou remplacement","description":"Prepare a mosque dome survey for cladding or replacement using geometry, opening positions, support conditions and measurement checks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mosquebuild.com\/fr\/mosque-dome-measurement-survey\/","og_locale":"fr_FR","og_type":"article","og_title":"How to Survey a Mosque Dome for Cladding or Replacement","og_description":"Prepare a mosque dome survey for cladding or replacement using geometry, opening positions, support conditions and measurement checks.","og_url":"https:\/\/www.mosquebuild.com\/fr\/mosque-dome-measurement-survey\/","og_site_name":"MosqueBuild","article_modified_time":"2026-11-09T21:06:30+00:00","twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mosquebuild.com\/mosque-dome-measurement-survey\/","url":"https:\/\/www.mosquebuild.com\/mosque-dome-measurement-survey\/","name":"Comment relever un d\u00f4me de mosqu\u00e9e pour rev\u00eatement ou remplacement","isPartOf":{"@id":"https:\/\/www.mosquebuild.com\/#website"},"datePublished":"2026-09-14T18:07:09+00:00","dateModified":"2026-11-09T21:06:30+00:00","description":"Prepare a mosque dome survey for cladding or replacement using geometry, opening positions, support conditions and measurement checks.","breadcrumb":{"@id":"https:\/\/www.mosquebuild.com\/mosque-dome-measurement-survey\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mosquebuild.com\/mosque-dome-measurement-survey\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.mosquebuild.com\/mosque-dome-measurement-survey\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mosquebuild.com\/"},{"@type":"ListItem","position":2,"name":"How to Survey a Mosque Dome for Cladding or Replacement"}]},{"@type":"WebSite","@id":"https:\/\/www.mosquebuild.com\/#website","url":"https:\/\/www.mosquebuild.com\/","name":"MosqueBuild","description":"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture","publisher":{"@id":"https:\/\/www.mosquebuild.com\/#organization"},"alternateName":"Mosque Build","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mosquebuild.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.mosquebuild.com\/#organization","name":"MosqueBuild","alternateName":"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri","url":"https:\/\/www.mosquebuild.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","contentUrl":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","width":919,"height":218,"caption":"MosqueBuild"},"image":{"@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/"},"description":"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.","legalName":"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130."}]}},"_links":{"self":[{"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/pages\/20696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/comments?post=20696"}],"version-history":[{"count":4,"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/pages\/20696\/revisions"}],"predecessor-version":[{"id":27628,"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/pages\/20696\/revisions\/27628"}],"wp:attachment":[{"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/media?parent=20696"}],"wp:term":[{"taxonomy":"mb_minaret_knowledge_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/mb_minaret_knowledge_section?post=20696"},{"taxonomy":"mb_minaret_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/fr\/wp-json\/wp\/v2\/mb_minaret_section?post=20696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}