{"id":23245,"date":"2026-09-27T19:25:08","date_gmt":"2026-09-27T19:25:08","guid":{"rendered":"https:\/\/www.mosquebuild.com\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/"},"modified":"2026-10-01T00:15:49","modified_gmt":"2026-10-01T00:15:49","slug":"mosque-preventive-maintenance","status":"publish","type":"page","link":"https:\/\/www.mosquebuild.com\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/","title":{"rendered":"Mosque Preventive Maintenance Checklist &#038; Planning Guide"},"content":{"rendered":"<nav class=\"mbgs-standard-nav\" aria-label=\"MosqueBuild guide library\">\n<div class=\"mbgs-standard-nav__inner\"><strong>MosqueBuild Guides<\/strong><\/p>\n<div class=\"mbgs-standard-nav__links\"><a href=\"\/ru\/mosque-design-buying-guides\/\">\u0411\u0438\u0431\u043b\u0438\u043e\u0442\u0435\u043a\u0430 \u0440\u0443\u043a\u043e\u0432\u043e\u0434\u0441\u0442\u0432<\/a><a href=\"\/ru\/chandelier\/\">\u041f\u0440\u043e\u0435\u043a\u0442 \u0434\u0438\u0437\u0430\u0439\u043d\u0430 \u043c\u0435\u0447\u0435\u0442\u0438 \u043d\u0430 \u0437\u0430\u043a\u0430\u0437 \u0434\u043b\u044f \u043f\u0440\u043e\u0435\u043a\u0442\u043e\u0432 \u043c\u0435\u0447\u0435\u0442\u0435\u0439<\/a><a href=\"\/ru\/minbar-mihrab-guides\/\">Mihrab &amp; Furniture<\/a><a href=\"\/ru\/mosque-doors-windows-woodwork-guides\/\">\u0414\u0432\u0435\u0440\u0438 &amp; \u0434\u0435\u0440\u0435\u0432\u044f\u043d\u043d\u044b\u0435 \u0438\u0437\u0434\u0435\u043b\u0438\u044f<\/a><a href=\"\/ru\/mosque-carpet-interior-equipment-guides\/\">Interior &amp; Carpet<\/a><a href=\"\/ru\/mosque-dome-minaret-construction-guides\/\">Dome &amp; Construction<\/a><a href=\"\/ru\/mosque-construction-library\/\">Construction Library<\/a><a href=\"\/ru\/mosque-interior-furniture-library\/\">Interior Architecture<\/a><\/div>\n<\/div>\n<\/nav>\n<article class=\"mb-technical-guide mb-expanded-guide\">\n<header>\n<p class=\"mb-kicker\">\u0422\u0435\u0445\u043d\u0438\u0447\u0435\u0441\u043a\u043e\u0435 \u0440\u0443\u043a\u043e\u0432\u043e\u0434\u0441\u0442\u0432\u043e MosqueBuild<\/p>\n<h1>Mosque Preventive Maintenance Checklist &amp; Planning Guide<\/h1>\n<p class=\"mb-lead\">Preventive maintenance reduces emergency failures by checking building systems, roof drainage, interiors and specialist mosque elements before defects disrupt worship or damage valuable finishes.<\/p>\n<\/header>\n<h2>Why mosque preventive maintenance needs early coordination<\/h2>\n<p>Preventive maintenance reduces emergency failures by checking building systems, roof drainage, interiors and specialist mosque elements before defects disrupt worship or damage valuable finishes. The most reliable projects define the functional requirement, confirm the real site or design information and assign responsibility before products or fabrication are released. On international projects, applicable local codes and authority requirements should be confirmed by the responsible professionals in the destination jurisdiction.<\/p>\n<h2>Key planning and technical priorities<\/h2>\n<h3>1. Create frequencies by risk<\/h3>\n<p>Not every asset needs the same interval. Base tasks on manufacturer guidance, operating hours, environment, failure consequence and legal inspection requirements. Record the accepted decision on the current drawings, schedule or project register so later teams do not have to reconstruct the design intent from emails or site assumptions.<\/p>\n<h3>2. Inspect the building envelope<\/h3>\n<p>Roofs, domes, gutters, outlets, sealants and penetrations should be checked regularly and after severe weather. Early water-path evidence is cheaper to address than interior damage. Record the accepted decision on the current drawings, schedule or project register so later teams do not have to reconstruct the design intent from emails or site assumptions.<\/p>\n<h3>3. Maintain MEP systems<\/h3>\n<p>Filters, drains, pumps, electrical panels, controls, emergency systems and wet-area equipment need planned access and records. Record readings or conditions where trends are useful. Record the accepted decision on the current drawings, schedule or project register so later teams do not have to reconstruct the design intent from emails or site assumptions.<\/p>\n<h3>4. Include specialist interiors<\/h3>\n<p>Chandeliers, doors, wood finishes, carpet, acoustic panels and movable partitions should appear on the maintenance schedule with approved cleaning and inspection methods. Record the accepted decision on the current drawings, schedule or project register so later teams do not have to reconstruct the design intent from emails or site assumptions.<\/p>\n<h3>5. Plan seasonal and event readiness<\/h3>\n<p>Before Ramadan, winter\/summer seasons or major events, check systems that will operate at different hours or higher loads and close known defects before occupancy increases. Record the accepted decision on the current drawings, schedule or project register so later teams do not have to reconstruct the design intent from emails or site assumptions.<\/p>\n<h2>Asset register and maintenance matrix<\/h2>\n<p>A useful preventive-maintenance plan starts with an asset register rather than one universal interval. Record the element, condition, warning signs, responsible person, inspection trigger and follow-up evidence.<\/p>\n<div class=\"mb-table-wrap\" style=\"overflow-x:auto\">\n<table>\n<thead>\n<tr>\n<th>Element<\/th>\n<th>Watch for<\/th>\n<th>Typical response<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Dome \/ roof<\/td>\n<td>Open seams, stains, loose flashings<\/td>\n<td>Inspect the water path and repair locally before widespread ingress.<\/td>\n<\/tr>\n<tr>\n<td>Rainwater system<\/td>\n<td>Blockage, overflow, leaking joints<\/td>\n<td>Clean, test discharge and record recurring defects.<\/td>\n<\/tr>\n<tr>\n<td>Minaret<\/td>\n<td>Cracks, loose finishes, corrosion<\/td>\n<td>Restrict unsafe access and obtain specialist review where required.<\/td>\n<\/tr>\n<tr>\n<td>Timber and joinery<\/td>\n<td>Moisture, insects, loose joints, finish failure<\/td>\n<td>Correct the source before repair or refinishing.<\/td>\n<\/tr>\n<tr>\n<td>Chandelier \/ lighting<\/td>\n<td>Loose components, wiring faults, suspension concerns<\/td>\n<td>Use competent electrical and suspension inspection.<\/td>\n<\/tr>\n<tr>\n<td>Wudu \/ wet areas<\/td>\n<td>Leaks, blocked drains, slippery surfaces<\/td>\n<td>Repair promptly before adjacent finishes or structure are damaged.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Inspection frequency should respond to exposure, age, manufacturer guidance, operating conditions and previous failure history. Storms, leaks, earthquakes, construction work or unusual occupancy can trigger additional inspections outside the normal schedule.<\/p>\n<h2>\u0420\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0443\u0435\u043c\u044b\u0439 \u0440\u0430\u0431\u043e\u0447\u0438\u0439 \u043f\u0440\u043e\u0446\u0435\u0441\u0441 \u043f\u0440\u043e\u0435\u043a\u0442\u0430<\/h2>\n<ol>\n<li><strong>Define the requirement.<\/strong> Record the project location, relevant occupancy or operating conditions, current drawings and exact problem to be solved.<\/li>\n<li><strong>Verify inputs.<\/strong> Distinguish measured or approved information from assumptions. Existing mosques should be surveyed before custom work is finalised.<\/li>\n<li><strong>Coordinate interfaces.<\/strong> Review architecture, structure, MEP, finishes, access and maintenance implications that affect this topic.<\/li>\n<li><strong>Approve evidence.<\/strong> Use drawings, schedules, samples, calculations, product data or tests appropriate to the project before procurement.<\/li>\n<li><strong>Inspect and hand over.<\/strong> Confirm the installed condition and retain final information for the mosque team.<\/li>\n<\/ol>\n<h2>\u0422\u0438\u043f\u0438\u0447\u043d\u044b\u0435 \u043e\u0448\u0438\u0431\u043a\u0438, \u043a\u043e\u0442\u043e\u0440\u044b\u0445 \u0441\u043b\u0435\u0434\u0443\u0435\u0442 \u0438\u0437\u0431\u0435\u0433\u0430\u0442\u044c<\/h2>\n<ul>\n<li>Using a checklist with no responsible person or due date.<\/li>\n<li>Treating visible cleanliness as proof systems are maintained.<\/li>\n<li>Ignoring roof drainage until leaks appear.<\/li>\n<li>Performing maintenance without recording completed work.<\/li>\n<\/ul>\n<h2>Project documents to retain<\/h2>\n<p>For this topic, keep at least the preventive-maintenance matrix, inspection checklists, defect\/action register and seasonal readiness report. Clear revision dates and responsible parties make these records usable during construction and future maintenance.<\/p>\n<h2>\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/h2>\n<h3>Can this be applied to an existing mosque?<\/h3>\n<p>Yes. Begin with verified site dimensions, photographs and the existing operating condition. Identify what must remain, what can be modified and which shutdown or access restrictions affect the work.<\/p>\n<h3>When should products be selected?<\/h3>\n<p>After the performance requirement and critical interfaces are defined well enough to compare options on the same basis. Selecting a product first can lock the project into dimensions or methods that later conflict with architecture, services or maintenance.<\/p>\n<h3>What should we send for a MosqueBuild review?<\/h3>\n<p>Send the project country, latest drawings or measured sketch, clear photographs, key dimensions and the required MosqueBuild scope. Include any known performance issue or existing-system information relevant to mosque preventive maintenance.<\/p>\n<h2>\u0421\u0432\u044f\u0437\u0430\u043d\u043d\u044b\u0435 \u0440\u0435\u0441\u0443\u0440\u0441\u044b MosqueBuild<\/h2>\n<p><a href=\"\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-facilities-management\/\">Facilities Management<\/a> \u00b7 <a href=\"\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-roof-inspection-maintenance\/\">Roof Inspection<\/a> \u00b7 <a href=\"\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-hvac-maintenance\/\">HVAC Maintenance<\/a> \u00b7 <a href=\"\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-chandelier-maintenance\/\">Chandelier Maintenance<\/a> \u00b7 <a href=\"\/ru\/guides\/\">All MosqueBuild Guides<\/a> \u00b7 <a href=\"\/ru\/%d0%ba%d0%be%d0%bd%d1%82%d0%b0%d0%ba%d1%82%d1%8b\/\">Request Project Review<\/a><\/p>\n<p><em>This guide supports project planning and coordination. Final structural, electrical, fire, accessibility, waterproofing and local-code compliance must be verified by the qualified professionals responsible for the actual project.<\/em><\/p>\n<section class=\"mb-guide-commerce-block\" style=\"margin:32px 0 26px\">\n<h2>Project Applications &#038; References<\/h2>\n<div style=\"margin-top:16px;padding:15px 17px;border:1px solid #e5dfd5;border-radius:14px;background:#faf8f4\"><strong>Our applications<\/strong><\/p>\n<div style=\"margin-top:6px\"><a href=\"\/ru\/%d1%80%d0%b5%d1%84%d0%b5%d1%80%d0%b5%d0%bd%d1%81%d1%8b\/\">View all MosqueBuild references \u2192<\/a><\/div>\n<\/div>\n<\/section>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>Preventive maintenance planning for mosque building systems, interiors, carpets, woodwork, chandeliers, roofs and wet areas.<\/p>","protected":false},"author":1,"featured_media":0,"parent":23236,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_mbkl_enabled":false,"_mbkl_owner_topic":"","_mbkl_min_words":750,"_mbkl_content_status":"planned","_mbkl_cluster_key":"","_mbkl_node_order":0,"_mbkl_source_notes":[],"_mbml_enabled":false,"_mbml_owner_topic":"","_mbml_min_words":750,"_mbml_content_status":"planned","_mbml_cluster_key":"","_mbml_node_order":0,"_mbml_source_notes":[]},"mb_minaret_knowledge_section":[],"mb_minaret_section":[],"class_list":["post-23245","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.8 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mosque Preventive Maintenance Checklist &amp; Planning Guide<\/title>\n<meta name=\"description\" content=\"Preventive maintenance planning for mosque building systems, interiors, carpets, woodwork, chandeliers, roofs and wet areas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mosquebuild.com\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mosque Preventive Maintenance Checklist &amp; Planning Guide\" \/>\n<meta property=\"og:description\" content=\"Preventive maintenance planning for mosque building systems, interiors, carpets, woodwork, chandeliers, roofs and wet areas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mosquebuild.com\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"MosqueBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-01T00:15:49+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 \u043c\u0438\u043d\u0443\u0442\u044b\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/guides\\\/mosque-operations-maintenance-guides\\\/mosque-preventive-maintenance\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/guides\\\/mosque-operations-maintenance-guides\\\/mosque-preventive-maintenance\\\/\",\"name\":\"Mosque Preventive Maintenance Checklist & Planning Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\"},\"datePublished\":\"2026-09-27T19:25:08+00:00\",\"dateModified\":\"2026-10-01T00:15:49+00:00\",\"description\":\"Preventive maintenance planning for mosque building systems, interiors, carpets, woodwork, chandeliers, roofs and wet areas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/guides\\\/mosque-operations-maintenance-guides\\\/mosque-preventive-maintenance\\\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mosquebuild.com\\\/guides\\\/mosque-operations-maintenance-guides\\\/mosque-preventive-maintenance\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/guides\\\/mosque-operations-maintenance-guides\\\/mosque-preventive-maintenance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mosquebuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MosqueBuild Guides &#038; Technical Library\",\"item\":\"https:\\\/\\\/www.mosquebuild.com\\\/guides\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mosque Operations &#038; Maintenance Guides\",\"item\":\"https:\\\/\\\/www.mosquebuild.com\\\/guides\\\/mosque-operations-maintenance-guides\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Mosque Preventive Maintenance Checklist &#038; Planning Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"name\":\"MosqueBuild\",\"description\":\"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\"},\"alternateName\":\"Mosque Build\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mosquebuild.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ru-RU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\",\"name\":\"MosqueBuild\",\"alternateName\":\"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"contentUrl\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"width\":919,\"height\":218,\"caption\":\"MosqueBuild\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"description\":\"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.\",\"legalName\":\"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mosque Preventive Maintenance Checklist & Planning Guide","description":"Preventive maintenance planning for mosque building systems, interiors, carpets, woodwork, chandeliers, roofs and wet areas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mosquebuild.com\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/","og_locale":"ru_RU","og_type":"article","og_title":"Mosque Preventive Maintenance Checklist & Planning Guide","og_description":"Preventive maintenance planning for mosque building systems, interiors, carpets, woodwork, chandeliers, roofs and wet areas.","og_url":"https:\/\/www.mosquebuild.com\/ru\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/","og_site_name":"MosqueBuild","article_modified_time":"2026-10-01T00:15:49+00:00","twitter_card":"summary_large_image","twitter_misc":{"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f":"4 \u043c\u0438\u043d\u0443\u0442\u044b"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mosquebuild.com\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/","url":"https:\/\/www.mosquebuild.com\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/","name":"Mosque Preventive Maintenance Checklist & Planning Guide","isPartOf":{"@id":"https:\/\/www.mosquebuild.com\/#website"},"datePublished":"2026-09-27T19:25:08+00:00","dateModified":"2026-10-01T00:15:49+00:00","description":"Preventive maintenance planning for mosque building systems, interiors, carpets, woodwork, chandeliers, roofs and wet areas.","breadcrumb":{"@id":"https:\/\/www.mosquebuild.com\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mosquebuild.com\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.mosquebuild.com\/guides\/mosque-operations-maintenance-guides\/mosque-preventive-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mosquebuild.com\/"},{"@type":"ListItem","position":2,"name":"MosqueBuild Guides &#038; Technical Library","item":"https:\/\/www.mosquebuild.com\/guides\/"},{"@type":"ListItem","position":3,"name":"Mosque Operations &#038; Maintenance Guides","item":"https:\/\/www.mosquebuild.com\/guides\/mosque-operations-maintenance-guides\/"},{"@type":"ListItem","position":4,"name":"Mosque Preventive Maintenance Checklist &#038; Planning Guide"}]},{"@type":"WebSite","@id":"https:\/\/www.mosquebuild.com\/#website","url":"https:\/\/www.mosquebuild.com\/","name":"MosqueBuild","description":"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture","publisher":{"@id":"https:\/\/www.mosquebuild.com\/#organization"},"alternateName":"Mosque Build","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mosquebuild.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":"Organization","@id":"https:\/\/www.mosquebuild.com\/#organization","name":"MosqueBuild","alternateName":"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri","url":"https:\/\/www.mosquebuild.com\/","logo":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","contentUrl":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","width":919,"height":218,"caption":"MosqueBuild"},"image":{"@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/"},"description":"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.","legalName":"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130."}]}},"_links":{"self":[{"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/pages\/23245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/comments?post=23245"}],"version-history":[{"count":4,"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/pages\/23245\/revisions"}],"predecessor-version":[{"id":24252,"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/pages\/23245\/revisions\/24252"}],"up":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/pages\/23236"}],"wp:attachment":[{"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/media?parent=23245"}],"wp:term":[{"taxonomy":"mb_minaret_knowledge_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/mb_minaret_knowledge_section?post=23245"},{"taxonomy":"mb_minaret_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/ru\/wp-json\/wp\/v2\/mb_minaret_section?post=23245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}