{"id":22124,"date":"2026-09-21T17:06:39","date_gmt":"2026-09-21T17:06:39","guid":{"rendered":"https:\/\/www.mosquebuild.com\/?page_id=22124"},"modified":"2026-10-01T00:09:10","modified_gmt":"2026-10-01T00:09:10","slug":"mosque-construction-scope-matrix","status":"publish","type":"page","link":"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-scope-matrix\/","title":{"rendered":"Cami \u0130n\u015faat \u0130\u015f Kapsam\u0131 Matrisi"},"content":{"rendered":"<nav class=\"mbgs-standard-nav\" aria-label=\"MosqueBuild guide library\"><div class=\"mbgs-standard-nav__inner\"><strong>MosqueBuild Rehberleri<\/strong><div class=\"mbgs-standard-nav__links\"><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-design-buying-guides\/\">Rehber K\u00fct\u00fcphanesi<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/chandelier\/\">Cami Projeleri \u0130\u00e7in \u00d6zel Cami Tasar\u0131m Projesi<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/minbar-mihrab-guides\/\">Mihrab &amp; Furniture<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-doors-windows-woodwork-guides\/\">Kap\u0131lar &amp; Ah\u015fap \u0130\u015fleri<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-carpet-interior-equipment-guides\/\">Interior &amp; Carpet<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-dome-minaret-construction-guides\/\">Dome &amp; Construction<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-library\/\">\u0130n\u015faat Bilgi K\u00fct\u00fcphanesi<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-interior-furniture-library\/\">\u0130\u00e7 Mimarl\u0131k<\/a><\/div><\/div><\/nav>\n\n<article class=\"mbcl-commercial-guide mbcl-longform\">\n<p class=\"mb-library-kicker\">Mosque Construction Library \u00b7 Scope &#038; Interface Management<\/p>\n<h1>Cami \u0130n\u015faat \u0130\u015f Kapsam\u0131 Matrisi<\/h1>\n<p class=\"mbcl-lead\">A mosque construction scope matrix assigns design, supply, installation and interface responsibilities across every major package. It is one of the simplest ways to prevent gaps when local contractors work with specialist mosque manufacturers and international suppliers.<\/p>\n<div class=\"mbcl-summary\"><strong>Use this guide to:<\/strong> define scope, coordinate responsibilities, reduce interface risk, prepare procurement information and improve project delivery before irreversible design, manufacturing or site decisions are made.<\/div>\n<h2>Why this topic matters in mosque construction<\/h2>\n<p>Mosque projects bring together ordinary building disciplines and specialist religious architecture. Decisions made in one package can affect several others: structure can change dome or minaret geometry; MEP routes can conflict with ceilings and decorative work; procurement can influence module sizes; and site access can determine how large specialist elements are manufactured. The project team should therefore treat this subject as part of an integrated information workflow rather than a stand-alone task.<\/p>\n<h2>Why scope gaps occur<\/h2><p>Drawings may show an element without defining who engineers the support, provides fixings, supplies electrical power, waterproofs penetrations, unloads the shipment or installs the final component. These gaps often appear only after contracts are signed.<\/p><h2>Packages to include<\/h2><p>Map site works, structure, roof, dome, minaret, fa\u00e7ade, waterproofing, MEP, ablution, ceilings, joinery, doors, chandeliers, carpet, AV, landscaping, testing and handover.<\/p><h2>Separate design, supply and installation<\/h2><p>For each item identify concept design, detailed design, calculations, shop drawings, material supply, transport, unloading, installation, testing, commissioning, warranty and maintenance information.<\/p><h2>Aray\u00fcz koordinasyon sat\u0131rlar\u0131<\/h2><p>Create dedicated rows for dome-to-roof, minaret-to-foundation, chandelier-to-structure, wall cladding-to-MEP access, doors-to-access control, carpet-to-floor preparation and fa\u00e7ade-to-waterproofing.<\/p><h2>Use the matrix during tender<\/h2><p>Include the matrix in tender documents and ask bidders to mark qualifications. This makes exclusions easier to identify and reduces post-award arguments about assumed responsibilities.<\/p><h2>Keep the matrix current<\/h2><p>Update the matrix after subcontract awards, value engineering and scope changes. A matrix that reflects the tender strategy but not the final procurement route becomes misleading.<\/p>\n<h2>\u00d6nerilen proje i\u015f ak\u0131\u015f\u0131<\/h2>\n<ol>\n<li><strong>Confirm the latest inputs.<\/strong> Verify drawings, site information, dimensions, project location, capacity and authority requirements.<\/li>\n<li><strong>Sorumluluklar\u0131 belirleyin.<\/strong> Identify the owner, architect, engineer, contractor, specialist supplier and approver for each deliverable.<\/li>\n<li><strong>Ba\u011flant\u0131 aray\u00fczlerini koordine et.<\/strong> Review structure, MEP, waterproofing, finishes, access, logistics and adjacent packages.<\/li>\n<li><strong>Issue controlled information.<\/strong> Use revision-controlled drawings, submittals, samples and written approvals.<\/li>\n<li><strong>Release procurement or fabrication.<\/strong> Do not release custom work before critical geometry and finishes are approved.<\/li>\n<li><strong>Inspect and document.<\/strong> Record key inspections, changes, tests and as-built information through handover.<\/li>\n<\/ol>\n<h2>Minimum information checklist<\/h2>\n<table class=\"mbcl-table\"><thead><tr><th>Bilgi<\/th><th>Why it matters<\/th><\/tr><\/thead><tbody>\n<tr><td>Project location and current stage<\/td><td>Determines authority context, logistics, climate assumptions and required level of detail.<\/td><\/tr>\n<tr><td>Latest architectural and structural drawings<\/td><td>Provides coordinated geometry, levels, openings and support conditions.<\/td><\/tr>\n<tr><td>Verified site dimensions where relevant<\/td><td>Reduces fabrication and installation errors caused by outdated drawings.<\/td><\/tr>\n<tr><td>\u0130\u015f kapsam\u0131 ve sorumluluk matrisi<\/td><td>Prevents gaps between design, supply, transport, installation and testing.<\/td><\/tr>\n<tr><td>Material and finish approvals<\/td><td>Creates a controlled benchmark for procurement and quality inspection.<\/td><\/tr>\n<tr><td>Programme and required-on-site dates<\/td><td>Connects approvals and long-lead manufacturing to the construction sequence.<\/td><\/tr>\n<\/tbody><\/table>\n<h2>Common coordination risks<\/h2>\n<ul>\n<li>Starting detailed work before geometry or site conditions are verified.<\/li>\n<li>Assuming another party owns an interface without documenting responsibility.<\/li>\n<li>Approving appearance without checking structure, access, waterproofing or maintenance.<\/li>\n<li>Releasing fabrication before shop drawings and material samples are fully coordinated.<\/li>\n<li>Ignoring transport, lifting, customs or site storage until production is complete.<\/li>\n<li>Failing to update as-built records after site changes.<\/li>\n<\/ul>\n<h2>RFQ and procurement questions<\/h2>\n<p>When requesting a quotation, issue enough information for suppliers to price the same scope. State the project location, dimensions, quantities, material and finish intent, drawing and engineering responsibilities, packaging and transport expectations, installation scope, programme, testing requirements, exclusions and required warranty information. For international projects, identify who controls customs clearance, unloading, local transport and site installation.<\/p>\n<h2>Kalite ve i\u015f teslimi<\/h2>\n<p>Project quality is easier to manage when approval and inspection points are planned before work begins. Preserve approved samples, shop drawings, inspection records, test reports, warranties and maintenance information. At handover, the owner should receive a clear record of what was installed, how it should be maintained and which components require future access or specialist replacement.<\/p>\n<h2>S\u0131k Sorulan Sorular<\/h2>\n<h3>When should this subject be addressed?<\/h3>\n<p>Early enough that dependent design, procurement and construction packages can still be changed without rework. For specialist mosque components this is usually before structural supports, service routes or finishes are frozen.<\/p>\n<h3>Who should approve the final technical solution?<\/h3>\n<p>The project\u2019s appointed designers, licensed engineers and relevant authorities remain responsible for regulated design and statutory approval within their jurisdiction. Specialist manufacturers can provide product, fabrication and interface information within their agreed scope.<\/p>\n<h3>Ayn\u0131 detay her camide yeniden kullan\u0131labilir mi?<\/h3>\n<p>No. Capacity, geometry, climate, codes, structure, local construction methods, transport limits and architectural language vary. Reusable standards are useful, but final design decisions should be project-specific.<\/p>\n<h3>What should be checked before installation?<\/h3>\n<p>Check the current approved drawings, site dimensions, substrate or support readiness, access and lifting needs, material condition, fixing locations, adjacent completed work and the required inspection sequence.<\/p>\n<section class=\"mbcl-context-links\"><h2>Continue through the project workflow<\/h2><p>This topic connects directly with <a href=\"\/tr\/mosque-construction-contractor\/\">\u0130n\u015faat y\u00fcklenicisi<\/a>, <a href=\"\/tr\/turnkey-mosque-contractor\/\">Anahtar teslim y\u00fcklenici<\/a>, <a href=\"\/tr\/mosque-rfi-technical-submittal-workflow\/\">Teknik belge onay i\u015f ak\u0131\u015f\u0131<\/a> and <a href=\"\/tr\/mosque-tender-evaluation\/\">\u0130hale tekliflerinin de\u011ferlendirilmesi<\/a>. Use these related guides to move from one project decision to the next without treating design, engineering, procurement and construction as isolated tasks.<\/p><\/section><h2>\u0130lgili MosqueBuild kaynaklar\u0131<\/h2>\n<ul class=\"mbcl-related-links\"><li><a href=\"\/tr\/mosque-design-build-services\/\">Tasar\u0131m ve yap\u0131m hizmetleri<\/a><\/li><li><a href=\"\/tr\/mosque-tender-evaluation\/\">\u0130hale tekliflerinin de\u011ferlendirilmesi<\/a><\/li><li><a href=\"\/tr\/mosque-rfi-technical-submittal-workflow\/\">RFI &#038; Submittal Workflow<\/a><\/li><li><a href=\"\/tr\/mosque-procurement-cost-logistics\/\">Procurement &#038; Logistics<\/a><\/li><li><a href=\"\/tr\/mosque-construction-library\/\">Cami \u0130n\u015faat\u0131 Bilgi K\u00fct\u00fcphanesi<\/a><\/li><\/ul>\n<div class=\"mbcl-note\"><strong>Projeye \u00f6zel tasar\u0131m notu:<\/strong> Structural, fire, accessibility, electrical, mechanical, waterproofing and other statutory requirements must be verified by the project\u2019s responsible licensed professionals and local authorities.<\/div>\n<section class=\"mbcl-v4-specific\"><h2>Example mosque scope-matrix interfaces<\/h2><table class=\"mbcl-table\"><thead><tr><th>Interface<\/th><th>Questions to assign<\/th><\/tr><\/thead><tbody><tr><td>Kubbeden \u00c7at\u0131ya<\/td><td>Who designs support, waterproofs the junction, supplies flashings and seals penetrations?<\/td><\/tr><tr><td>Minaret to foundation<\/td><td>Who provides anchor setting-out, templates, grout, base plates and final survey?<\/td><\/tr><tr><td>Chandelier to structure<\/td><td>Who confirms load, suspension steel, power feed, winch\/access and final connection?<\/td><\/tr><tr><td>Wall cladding to MEP<\/td><td>Who coordinates sockets, access panels, controls and removable sections?<\/td><\/tr><tr><td>\u0130thal Ah\u015fap \u0130\u015fleri<\/td><td>Who surveys openings, packs, ships, unloads, stores, installs and protects completed work?<\/td><\/tr><\/tbody><\/table><h2>How to use the scope matrix contractually<\/h2><p>Attach the current matrix to tender clarifications and contract scope so responsibilities are not left only in meeting minutes. When value engineering or package reassignment changes an interface, update both the matrix and affected drawings before the next procurement release.<\/p><\/section><section class=\"mb-guide-commerce-block\" style=\"margin:32px 0 26px\"><h2>Project Applications &#038; References<\/h2><div style=\"margin-top:16px;padding:15px 17px;border:1px solid #e5dfd5;border-radius:14px;background:#faf8f4\"><strong>Uygulamalar\u0131m\u0131z<\/strong><div style=\"margin-top:6px\"><a href=\"\/tr\/referanslar\/\">T\u00fcm MosqueBuild Referanslar\u0131n\u0131 G\u00f6r \u2190<\/a><\/div><\/div><\/section><\/article>","protected":false},"excerpt":{"rendered":"<p>A mosque construction scope matrix assigns design, supply, installation and interface responsibilities across every major package. It is one of the simplest ways to prevent gaps when local contractors work with specialist mosque manufacturers and international suppliers.<\/p>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_mbkl_enabled":false,"_mbkl_owner_topic":"","_mbkl_min_words":750,"_mbkl_content_status":"planned","_mbkl_cluster_key":"","_mbkl_node_order":0,"_mbkl_source_notes":[],"_mbml_enabled":false,"_mbml_owner_topic":"","_mbml_min_words":750,"_mbml_content_status":"planned","_mbml_cluster_key":"","_mbml_node_order":0,"_mbml_source_notes":[]},"mb_minaret_knowledge_section":[],"mb_minaret_section":[],"class_list":["post-22124","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mosque Construction Scope Matrix | MosqueBuild<\/title>\n<meta name=\"description\" content=\"Scope matrix for mosque construction covering design, supply, installation, engineering, logistics and interfaces across every major work package.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-scope-matrix\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mosque Construction Scope Matrix\" \/>\n<meta property=\"og:description\" content=\"Scope matrix for mosque construction covering design, supply, installation, engineering, logistics and interfaces across every major work package.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-scope-matrix\/\" \/>\n<meta property=\"og:site_name\" content=\"MosqueBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-01T00:09:10+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-scope-matrix\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-scope-matrix\\\/\",\"name\":\"Mosque Construction Scope Matrix | MosqueBuild\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\"},\"datePublished\":\"2026-09-21T17:06:39+00:00\",\"dateModified\":\"2026-10-01T00:09:10+00:00\",\"description\":\"Scope matrix for mosque construction covering design, supply, installation, engineering, logistics and interfaces across every major work package.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-scope-matrix\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-scope-matrix\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-scope-matrix\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mosquebuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mosque Construction Scope Matrix\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"name\":\"MosqueBuild\",\"description\":\"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\"},\"alternateName\":\"Mosque Build\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mosquebuild.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\",\"name\":\"MosqueBuild\",\"alternateName\":\"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"contentUrl\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"width\":919,\"height\":218,\"caption\":\"MosqueBuild\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"description\":\"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.\",\"legalName\":\"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cami \u0130n\u015faat \u0130\u015f Kapsam\u0131 Matrisi | MosqueBuild","description":"Scope matrix for mosque construction covering design, supply, installation, engineering, logistics and interfaces across every major work package.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-scope-matrix\/","og_locale":"tr_TR","og_type":"article","og_title":"Mosque Construction Scope Matrix","og_description":"Scope matrix for mosque construction covering design, supply, installation, engineering, logistics and interfaces across every major work package.","og_url":"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-scope-matrix\/","og_site_name":"MosqueBuild","article_modified_time":"2026-10-01T00:09:10+00:00","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"5 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mosquebuild.com\/mosque-construction-scope-matrix\/","url":"https:\/\/www.mosquebuild.com\/mosque-construction-scope-matrix\/","name":"Cami \u0130n\u015faat \u0130\u015f Kapsam\u0131 Matrisi | MosqueBuild","isPartOf":{"@id":"https:\/\/www.mosquebuild.com\/#website"},"datePublished":"2026-09-21T17:06:39+00:00","dateModified":"2026-10-01T00:09:10+00:00","description":"Scope matrix for mosque construction covering design, supply, installation, engineering, logistics and interfaces across every major work package.","breadcrumb":{"@id":"https:\/\/www.mosquebuild.com\/mosque-construction-scope-matrix\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mosquebuild.com\/mosque-construction-scope-matrix\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.mosquebuild.com\/mosque-construction-scope-matrix\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mosquebuild.com\/"},{"@type":"ListItem","position":2,"name":"Mosque Construction Scope Matrix"}]},{"@type":"WebSite","@id":"https:\/\/www.mosquebuild.com\/#website","url":"https:\/\/www.mosquebuild.com\/","name":"MosqueBuild","description":"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture","publisher":{"@id":"https:\/\/www.mosquebuild.com\/#organization"},"alternateName":"Mosque Build","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mosquebuild.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/www.mosquebuild.com\/#organization","name":"MosqueBuild","alternateName":"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri","url":"https:\/\/www.mosquebuild.com\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","contentUrl":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","width":919,"height":218,"caption":"MosqueBuild"},"image":{"@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/"},"description":"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.","legalName":"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130."}]}},"_links":{"self":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages\/22124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/comments?post=22124"}],"version-history":[{"count":3,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages\/22124\/revisions"}],"predecessor-version":[{"id":24178,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages\/22124\/revisions\/24178"}],"wp:attachment":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/media?parent=22124"}],"wp:term":[{"taxonomy":"mb_minaret_knowledge_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/mb_minaret_knowledge_section?post=22124"},{"taxonomy":"mb_minaret_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/mb_minaret_section?post=22124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}