{"id":22127,"date":"2026-09-21T17:06:39","date_gmt":"2026-09-21T17:06:39","guid":{"rendered":"https:\/\/www.mosquebuild.com\/?page_id=22127"},"modified":"2026-10-01T00:09:20","modified_gmt":"2026-10-01T00:09:20","slug":"mosque-construction-qa-qc-plan","status":"publish","type":"page","link":"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-qa-qc-plan\/","title":{"rendered":"Cami \u0130n\u015faat\u0131 Kalite G\u00fcvence \/ Kalite Kontrol Plan\u0131"},"content":{"rendered":"<nav class=\"mbgs-standard-nav\" aria-label=\"MosqueBuild guide library\"><div class=\"mbgs-standard-nav__inner\"><strong>MosqueBuild Rehberleri<\/strong><div class=\"mbgs-standard-nav__links\"><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-design-buying-guides\/\">Rehber K\u00fct\u00fcphanesi<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/chandelier\/\">Cami Projeleri \u0130\u00e7in \u00d6zel Cami Tasar\u0131m Projesi<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/minbar-mihrab-guides\/\">Mihrab &amp; Furniture<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-doors-windows-woodwork-guides\/\">Kap\u0131lar &amp; Ah\u015fap \u0130\u015fleri<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-carpet-interior-equipment-guides\/\">Interior &amp; Carpet<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-dome-minaret-construction-guides\/\">Dome &amp; Construction<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-library\/\">\u0130n\u015faat Bilgi K\u00fct\u00fcphanesi<\/a><a href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-interior-furniture-library\/\">\u0130\u00e7 Mimarl\u0131k<\/a><\/div><\/div><\/nav>\n\n<article class=\"mbcl-commercial-guide mbcl-longform\">\n<p class=\"mb-library-kicker\">Mosque Construction Library \u00b7 Quality Assurance &#038; Quality Control<\/p>\n<h1>Cami \u0130n\u015faat\u0131 Kalite G\u00fcvence \/ Kalite Kontrol Plan\u0131<\/h1>\n<p class=\"mbcl-lead\">A mosque construction QA\/QC plan translates drawings and specifications into planned checks before work is covered or accepted. It should address normal building systems and the specialist elements that define mosque architecture and worship function.<\/p>\n<div class=\"mbcl-summary\"><strong>Use this guide to:<\/strong> define scope, coordinate responsibilities, reduce interface risk, prepare procurement information and improve project delivery before irreversible design, manufacturing or site decisions are made.<\/div>\n<h2>Why this topic matters in mosque construction<\/h2>\n<p>Mosque projects bring together ordinary building disciplines and specialist religious architecture. Decisions made in one package can affect several others: structure can change dome or minaret geometry; MEP routes can conflict with ceilings and decorative work; procurement can influence module sizes; and site access can determine how large specialist elements are manufactured. The project team should therefore treat this subject as part of an integrated information workflow rather than a stand-alone task.<\/p>\n<h2>Kalite plan\u0131n\u0131n yap\u0131s\u0131<\/h2><p>Define applicable documents, responsibilities, submittal process, inspection requests, material control, testing, non-conformance, document control and handover records. The plan should be project-specific rather than a generic company manual.<\/p><h2>Inspection and test plans<\/h2><p>Create ITPs for concrete, steel, waterproofing, roofing, dome and minaret works, MEP, ablution, finishes and specialist installations. Identify witness points and hold points before each activity starts.<\/p><h2>Malzeme do\u011frulamas\u0131<\/h2><p>Check delivered materials against approved submittals and samples. Record certificates, batch information, finish reference and storage requirements where relevant.<\/p><h2>\u00d6l\u00e7\u00fc Kontrol\u00fc<\/h2><p>Survey critical geometry including dome rings, minaret axes, openings, qibla-wall dimensions, chandelier supports and repeated interior modules. Do not wait until finishing work exposes accumulated error.<\/p><h2>Uygunsuzluk y\u00f6netimi<\/h2><p>Record the issue, immediate action, proposed correction, technical approval and evidence of closeout. Rework should be reinspected before the NCR is closed.<\/p><h2>Handover quality dossier<\/h2><p>Compile approved drawings, test results, inspections, warranties, material data, certificates, as-built information and maintenance requirements into a structured closeout record.<\/p>\n<h2>\u00d6nerilen proje i\u015f ak\u0131\u015f\u0131<\/h2>\n<ol>\n<li><strong>Confirm the latest inputs.<\/strong> Verify drawings, site information, dimensions, project location, capacity and authority requirements.<\/li>\n<li><strong>Sorumluluklar\u0131 belirleyin.<\/strong> Identify the owner, architect, engineer, contractor, specialist supplier and approver for each deliverable.<\/li>\n<li><strong>Ba\u011flant\u0131 aray\u00fczlerini koordine et.<\/strong> Review structure, MEP, waterproofing, finishes, access, logistics and adjacent packages.<\/li>\n<li><strong>Issue controlled information.<\/strong> Use revision-controlled drawings, submittals, samples and written approvals.<\/li>\n<li><strong>Release procurement or fabrication.<\/strong> Do not release custom work before critical geometry and finishes are approved.<\/li>\n<li><strong>Inspect and document.<\/strong> Record key inspections, changes, tests and as-built information through handover.<\/li>\n<\/ol>\n<h2>Minimum information checklist<\/h2>\n<table class=\"mbcl-table\"><thead><tr><th>Bilgi<\/th><th>Why it matters<\/th><\/tr><\/thead><tbody>\n<tr><td>Project location and current stage<\/td><td>Determines authority context, logistics, climate assumptions and required level of detail.<\/td><\/tr>\n<tr><td>Latest architectural and structural drawings<\/td><td>Provides coordinated geometry, levels, openings and support conditions.<\/td><\/tr>\n<tr><td>Verified site dimensions where relevant<\/td><td>Reduces fabrication and installation errors caused by outdated drawings.<\/td><\/tr>\n<tr><td>\u0130\u015f kapsam\u0131 ve sorumluluk matrisi<\/td><td>Prevents gaps between design, supply, transport, installation and testing.<\/td><\/tr>\n<tr><td>Material and finish approvals<\/td><td>Creates a controlled benchmark for procurement and quality inspection.<\/td><\/tr>\n<tr><td>Programme and required-on-site dates<\/td><td>Connects approvals and long-lead manufacturing to the construction sequence.<\/td><\/tr>\n<\/tbody><\/table>\n<h2>Common coordination risks<\/h2>\n<ul>\n<li>Starting detailed work before geometry or site conditions are verified.<\/li>\n<li>Assuming another party owns an interface without documenting responsibility.<\/li>\n<li>Approving appearance without checking structure, access, waterproofing or maintenance.<\/li>\n<li>Releasing fabrication before shop drawings and material samples are fully coordinated.<\/li>\n<li>Ignoring transport, lifting, customs or site storage until production is complete.<\/li>\n<li>Failing to update as-built records after site changes.<\/li>\n<\/ul>\n<h2>RFQ and procurement questions<\/h2>\n<p>When requesting a quotation, issue enough information for suppliers to price the same scope. State the project location, dimensions, quantities, material and finish intent, drawing and engineering responsibilities, packaging and transport expectations, installation scope, programme, testing requirements, exclusions and required warranty information. For international projects, identify who controls customs clearance, unloading, local transport and site installation.<\/p>\n<h2>Kalite ve i\u015f teslimi<\/h2>\n<p>Project quality is easier to manage when approval and inspection points are planned before work begins. Preserve approved samples, shop drawings, inspection records, test reports, warranties and maintenance information. At handover, the owner should receive a clear record of what was installed, how it should be maintained and which components require future access or specialist replacement.<\/p>\n<h2>S\u0131k Sorulan Sorular<\/h2>\n<h3>When should this subject be addressed?<\/h3>\n<p>Early enough that dependent design, procurement and construction packages can still be changed without rework. For specialist mosque components this is usually before structural supports, service routes or finishes are frozen.<\/p>\n<h3>Who should approve the final technical solution?<\/h3>\n<p>The project\u2019s appointed designers, licensed engineers and relevant authorities remain responsible for regulated design and statutory approval within their jurisdiction. Specialist manufacturers can provide product, fabrication and interface information within their agreed scope.<\/p>\n<h3>Ayn\u0131 detay her camide yeniden kullan\u0131labilir mi?<\/h3>\n<p>No. Capacity, geometry, climate, codes, structure, local construction methods, transport limits and architectural language vary. Reusable standards are useful, but final design decisions should be project-specific.<\/p>\n<h3>What should be checked before installation?<\/h3>\n<p>Check the current approved drawings, site dimensions, substrate or support readiness, access and lifting needs, material condition, fixing locations, adjacent completed work and the required inspection sequence.<\/p>\n<section class=\"mbcl-context-links\"><h2>Continue through the project workflow<\/h2><p>This topic connects directly with <a href=\"\/tr\/mosque-construction-supervision\/\">\u0130n\u015faat kontroll\u00fc\u011f\u00fc<\/a>, <a href=\"\/tr\/mosque-mockup-sample-approval\/\">Numune model onay\u0131<\/a>, <a href=\"\/tr\/mosque-rfi-technical-submittal-workflow\/\">teknik onay dosyalar\u0131<\/a> and <a href=\"\/tr\/mosque-project-management-services\/\">project management<\/a>. Use these related guides to move from one project decision to the next without treating design, engineering, procurement and construction as isolated tasks.<\/p><\/section><h2>\u0130lgili MosqueBuild kaynaklar\u0131<\/h2>\n<ul class=\"mbcl-related-links\"><li><a href=\"\/tr\/mosque-construction-supervision\/\">\u0130n\u015faat kontroll\u00fc\u011f\u00fc<\/a><\/li><li><a href=\"\/tr\/mosque-mockup-sample-approval\/\">Mock-Ups &#038; Samples<\/a><\/li><li><a href=\"\/tr\/mosque-testing-and-commissioning\/\">Testing &#038; Commissioning<\/a><\/li><li><a href=\"\/tr\/mosque-snagging-and-handover\/\">Snagging &#038; Handover<\/a><\/li><li><a href=\"\/tr\/mosque-construction-library\/\">Cami \u0130n\u015faat\u0131 Bilgi K\u00fct\u00fcphanesi<\/a><\/li><\/ul>\n<div class=\"mbcl-note\"><strong>Projeye \u00f6zel tasar\u0131m notu:<\/strong> Structural, fire, accessibility, electrical, mechanical, waterproofing and other statutory requirements must be verified by the project\u2019s responsible licensed professionals and local authorities.<\/div>\n<section class=\"mb-guide-commerce-block\" style=\"margin:32px 0 26px\"><h2>Project Applications &#038; References<\/h2><div style=\"margin-top:16px;padding:15px 17px;border:1px solid #e5dfd5;border-radius:14px;background:#faf8f4\"><strong>Uygulamalar\u0131m\u0131z<\/strong><div style=\"margin-top:6px\"><a href=\"\/tr\/referanslar\/\">T\u00fcm MosqueBuild Referanslar\u0131n\u0131 G\u00f6r \u2190<\/a><\/div><\/div><\/section><\/article>","protected":false},"excerpt":{"rendered":"<p>A mosque construction QA\/QC plan translates drawings and specifications into planned checks before work is covered or accepted. It should address normal building systems and the specialist elements that define mosque architecture and worship function.<\/p>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_mbkl_enabled":false,"_mbkl_owner_topic":"","_mbkl_min_words":750,"_mbkl_content_status":"planned","_mbkl_cluster_key":"","_mbkl_node_order":0,"_mbkl_source_notes":[],"_mbml_enabled":false,"_mbml_owner_topic":"","_mbml_min_words":750,"_mbml_content_status":"planned","_mbml_cluster_key":"","_mbml_node_order":0,"_mbml_source_notes":[]},"mb_minaret_knowledge_section":[],"mb_minaret_section":[],"class_list":["post-22127","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mosque Construction QA\/QC Plan | MosqueBuild<\/title>\n<meta name=\"description\" content=\"Mosque QA\/QC planning for inspection points, materials, dimensional control, non-conformance, specialist packages and handover records.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-qa-qc-plan\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mosque Construction QA\/QC Plan\" \/>\n<meta property=\"og:description\" content=\"Mosque QA\/QC planning for inspection points, materials, dimensional control, non-conformance, specialist packages and handover records.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-qa-qc-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"MosqueBuild\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-01T00:09:20+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-qa-qc-plan\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-qa-qc-plan\\\/\",\"name\":\"Mosque Construction QA\\\/QC Plan | MosqueBuild\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\"},\"datePublished\":\"2026-09-21T17:06:39+00:00\",\"dateModified\":\"2026-10-01T00:09:20+00:00\",\"description\":\"Mosque QA\\\/QC planning for inspection points, materials, dimensional control, non-conformance, specialist packages and handover records.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-qa-qc-plan\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-qa-qc-plan\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/mosque-construction-qa-qc-plan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mosquebuild.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mosque Construction QA\\\/QC Plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"name\":\"MosqueBuild\",\"description\":\"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\"},\"alternateName\":\"Mosque Build\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mosquebuild.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#organization\",\"name\":\"MosqueBuild\",\"alternateName\":\"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"contentUrl\":\"https:\\\/\\\/www.mosquebuild.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/siyahlogo.png\",\"width\":919,\"height\":218,\"caption\":\"MosqueBuild\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mosquebuild.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"description\":\"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.\",\"legalName\":\"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mosque Construction QA\/QC Plan | MosqueBuild","description":"Mosque QA\/QC planning for inspection points, materials, dimensional control, non-conformance, specialist packages and handover records.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-qa-qc-plan\/","og_locale":"tr_TR","og_type":"article","og_title":"Mosque Construction QA\/QC Plan","og_description":"Mosque QA\/QC planning for inspection points, materials, dimensional control, non-conformance, specialist packages and handover records.","og_url":"https:\/\/www.mosquebuild.com\/tr\/mosque-construction-qa-qc-plan\/","og_site_name":"MosqueBuild","article_modified_time":"2026-10-01T00:09:20+00:00","twitter_card":"summary_large_image","twitter_misc":{"Tahmini okuma s\u00fcresi":"4 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mosquebuild.com\/mosque-construction-qa-qc-plan\/","url":"https:\/\/www.mosquebuild.com\/mosque-construction-qa-qc-plan\/","name":"Mosque Construction QA\/QC Plan | MosqueBuild","isPartOf":{"@id":"https:\/\/www.mosquebuild.com\/#website"},"datePublished":"2026-09-21T17:06:39+00:00","dateModified":"2026-10-01T00:09:20+00:00","description":"Mosque QA\/QC planning for inspection points, materials, dimensional control, non-conformance, specialist packages and handover records.","breadcrumb":{"@id":"https:\/\/www.mosquebuild.com\/mosque-construction-qa-qc-plan\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mosquebuild.com\/mosque-construction-qa-qc-plan\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.mosquebuild.com\/mosque-construction-qa-qc-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mosquebuild.com\/"},{"@type":"ListItem","position":2,"name":"Mosque Construction QA\/QC Plan"}]},{"@type":"WebSite","@id":"https:\/\/www.mosquebuild.com\/#website","url":"https:\/\/www.mosquebuild.com\/","name":"MosqueBuild","description":"Mosque Construction, Custom Mosque Furniture &amp; Islamic Architecture","publisher":{"@id":"https:\/\/www.mosquebuild.com\/#organization"},"alternateName":"Mosque Build","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mosquebuild.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/www.mosquebuild.com\/#organization","name":"MosqueBuild","alternateName":"Stoneplus Yap\u0131 Ah\u015fap \u00dcr\u00fcnleri","url":"https:\/\/www.mosquebuild.com\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","contentUrl":"https:\/\/www.mosquebuild.com\/wp-content\/uploads\/2025\/06\/siyahlogo.png","width":919,"height":218,"caption":"MosqueBuild"},"image":{"@id":"https:\/\/www.mosquebuild.com\/#\/schema\/logo\/image\/"},"description":"MosqueBuild is a T\u00fcrkiye-based manufacturer and project supplier for custom mosque furniture, mihrabs, minbars, mosque doors, chandeliers and architectural mosque elements for international projects.","legalName":"STONEPLUS YAPI AH\u015eAP \u00dcR\u00dcNLER\u0130 \u0130N\u015eAAT \u0130THALAT \u0130HRACAT VE DI\u015e T\u0130CARET LTD. \u015eT\u0130."}]}},"_links":{"self":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages\/22127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/comments?post=22127"}],"version-history":[{"count":3,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages\/22127\/revisions"}],"predecessor-version":[{"id":24181,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/pages\/22127\/revisions\/24181"}],"wp:attachment":[{"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/media?parent=22127"}],"wp:term":[{"taxonomy":"mb_minaret_knowledge_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/mb_minaret_knowledge_section?post=22127"},{"taxonomy":"mb_minaret_section","embeddable":true,"href":"https:\/\/www.mosquebuild.com\/tr\/wp-json\/wp\/v2\/mb_minaret_section?post=22127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}