Leitfaden zur Moscheerestaurierung›Documentation & Handover

Mosque Restoration Documentation & Handover

A restoration project should leave a complete technical memory of the building. Future committees and professionals should be able to distinguish original condition, investigation, approved intervention and final as-built work without reconstructing the project from scattered emails.

1. Before-work record

  • Bestandsaufmaß
  • Zustands- und Schadenskarten
  • Photo register
  • Historic drawings and images
  • Material / paint / structural investigations
  • Bestandsprotokoll der technischen Anlagen

2. Planungsdokumentation

  • Freigegebene Restaurierungszeichnungen
  • Structural and MEP documents
  • Intervention schedules
  • Materialspezifikationen
  • Werkstattzeichnungen
  • Authority or review approvals where applicable

3. Baudokumentation

RecordZweck
BaustellenfotosShow concealed and completed work
PrüfprotokolleConfirm hold points and acceptance
MusterfreigabenPreserve colour, texture and material benchmark
ÄnderungsprotokollExplain departures from approved design
ErkundungsprotokollRecord unexpected historic or technical findings

4. As-built package

Update final geometry, service routes, access panels and specialist fabrication information. Mark where concealed fixings or future maintenance points are located.

5. Material and warranty register

Record manufacturer, product, finish, batch or colour reference where relevant, supplier contact, warranty and replacement information.

6. Wartungspaket

  • Inspection priorities
  • Cleaning restrictions
  • Replacement lamps / drivers / filters
  • Zugang zur Kuppel und Regenwasserableitung
  • Timber and decorative-finish care
  • Known watch points

7. Digital file structure

Separate Bestandszustand, Planung, Baustellenprotokoll and as-built folders. Use date, discipline and revision in file names.

8. Handover meeting

Do not simply email a folder. Walk the mosque management team through access points, maintenance requirements, warranties and early-warning signs.

9. Häufig gestellte Fragen

Why keep photographs of concealed work?

They help future repairs avoid destructive investigation and show how supports, waterproofing or services were actually installed.

Should old superseded drawings be deleted?

No. Archive them clearly as superseded so the change history remains understandable.