
Mosque Restoration RFQ & Tender Guide
Mosque Restoration RFQ & Tender Guide
Restoration prices cannot be compared fairly when bidders assume different scopes. A strong RFQ provides the same technical baseline, identifies unknowns and requires every bidder to state exclusions, provisional items and specialist responsibilities.
1. Define the procurement objective
Clarify whether the package is investigation, design-assist, specialist conservation, supply-only, supply-and-install or complete contracting. Do not use one vague scope sentence for multiple delivery models.
2. Issue baseline information
- Project location and legal / heritage status if known
- обмерные чертежи
- фотографии текущего состояния
- Defect / investigation reports
- Elements to retain
- Operational constraints
- Target programme
3. Define responsibility boundaries
| Item | State who provides it |
|---|---|
| Scaffold / access | Client, main contractor or specialist |
| Engineering | Named professional / bidder / separate consultant |
| Samples / mock-ups | Quantity, size and approval route |
| Protection | Carpet, stone, decorative work and occupied areas |
| Lifting / transport | Who unloads, stores and hoists |
| Handover records | Required format and level of detail |
4. Separate fixed, provisional and investigative scope
Unknown concealed conditions should not be hidden inside a fixed price. Use provisional quantities, unit rates or defined investigation stages where appropriate.
5. Require technical submissions
- Method statement
- Программа
- Material data
- Sample plan
- Quality-control plan
- Team and specialist experience
- Exclusions and assumptions
6. Bid evaluation matrix
Does it address cause, material and interfaces?
Are exclusions transparent?
Are approvals and lead times realistic?
Are samples and inspection points defined?
7. Change control
Define how unexpected conditions are photographed, priced, approved and recorded before work proceeds.
8. RFQ checklist
- Same documents issued to all bidders
- Revision date shown
- Scope boundaries clear
- Access included
- Occupied-building constraints stated
- Samples and handover included
- Bid-return format standardised
9. Frequently asked questions
Why is the lowest restoration bid risky?
It may exclude access, protection, specialist treatment, documentation or unknown-condition allowances that other bidders included.
Should all unknowns be priced as fixed?
No. Defined provisional quantities or investigation stages can make uncertainty more transparent.